Remedial work

Upgrading of existing connections in onshore foundations with UHPC Ducorit®

  

In cases where the connection between an embedded tower flange and the concrete foundation has failed, resulting in undesired tower movements, ITW Engineered Polymers provide a cost beneficial solution for the remedial work, arresting the movements by injecting Ducorit® IQ into the concrete foundation.

The ultra high performance injection mortar and extreme viscous properties of the Ducorit® IQ, makes it ideal for this type of remedial work, where voids of varying volume have to be filled to re-establish a durable and reliable connection between the foundation and the tower flange.

ITW Engineered Polymers